{"id":2576,"date":"2026-08-08T01:50:28","date_gmt":"2026-08-07T22:50:28","guid":{"rendered":"https:\/\/picajet.com\/articles\/glossary\/business-continuity-plan\/"},"modified":"2026-08-08T03:45:54","modified_gmt":"2026-08-08T00:45:54","slug":"business-continuity-plan","status":"publish","type":"glossary","link":"https:\/\/picajet.com\/articles\/glossary\/business-continuity-plan\/","title":{"rendered":"Business continuity plan"},"content":{"rendered":"<p class=\"wp-block-paragraph\">A business continuity plan (BCP) is the organizational answer to &#8220;what do we do while the primary system is down,&#8221; as distinct from disaster recovery, which is the technical answer to &#8220;how do we get the primary system back.&#8221; For a company whose DAM feeds live product pages, syndicated marketplace listings, or an active ad campaign, the two are tightly linked: the BCP has to specify how imagery keeps flowing to customer-facing channels for the hours or days it takes to restore the DAM itself.<\/p><p class=\"wp-block-paragraph\">ISO 22301:2019 is the international standard for business continuity management systems. It defines business continuity as an organization&#8217;s capacity to keep delivering products and services, at a predefined capacity, within acceptable timeframes, during a disruption \u2014 and it requires the plan to be tested and improved, not just documented. Enterprise DAM buyers in regulated or high-revenue-risk industries increasingly ask vendors whether their own continuity practices are ISO 22301-aligned, and separately need their own internal plan for the case where the vendor itself is the point of failure.<\/p><p class=\"wp-block-paragraph\">In practice, a DAM-relevant BCP names specific fallbacks: which renditions are cached at the CDN edge and will keep serving even if the origin DAM is unreachable, which small set of business-critical assets (current-season product shots, active campaign creative) are kept in a manually maintained backup location outside the DAM, and who has authority to redirect systems to that fallback without waiting for a change-approval process that assumes normal operating conditions.<\/p>","protected":false},"excerpt":{"rendered":"<p>A documented plan for keeping critical operations \u2014 including access to the DAM and its assets \u2014 running during and after a disruption such as an outage, cyberattack, or natural disaster.<\/p>\n","protected":false},"author":0,"featured_media":0,"template":"","meta":{"footnotes":"","faq":[{"question":"How is a business continuity plan different from disaster recovery?","answer":"A BCP is the organizational answer to \"what do we do while the primary system is down\"; disaster recovery is the technical answer to \"how do we get the primary system back.\""},{"question":"What does ISO 22301 require of a business continuity plan?","answer":"It defines business continuity as the capacity to keep delivering products and services, at a predefined capacity, within acceptable timeframes during a disruption, and requires the plan to be tested and improved, not just documented."},{"question":"What kind of DAM outage does a BCP treat as a continuity event?","answer":"A DAM outage during a live e-commerce launch or active campaign, which stalls customer-facing operations rather than being just an IT ticket."},{"question":"What fallbacks might a DAM-relevant BCP specify?","answer":"Which renditions are cached at the CDN edge to keep serving if the origin DAM is down, and which business-critical assets are kept in a manually maintained backup location outside the DAM."},{"question":"What's the most common failure with business continuity plans?","answer":"They're written once to satisfy an audit or procurement checklist and never rehearsed, so nobody actually knows the manual steps when an incident hits."},{"question":"Who should have authority to activate a BCP's fallback during an incident?","answer":"Someone specifically named in the plan with authority to redirect systems to the fallback without waiting for a change-approval process built for normal conditions."}],"checked_date":"2026-08-07","sources":[{"statement":"ISO 22301:2019 is the international standard for business continuity management systems (BCMS), defining requirements for organizations to prepare for, respond to, and recover from disruptive incidents.","source_name":"ISO","url":"https:\/\/www.iso.org\/standard\/75106.html","checked":"2026-08-07"}],"kicker":"","fact_checker":0,"reading_time":0,"revisions":[],"seo_title":"","seo_description":"","noindex":false,"related":[2417,2492,2548,2585,2578,2550],"definition":"A documented plan for keeping critical operations \u2014 including access to the DAM and its assets \u2014 running during and after a disruption such as an outage, cyberattack, or natural disaster.","why":"Companies whose e-commerce, publishing, or campaign operations depend on the DAM to serve live imagery treat a DAM outage during a launch as a business continuity event, not an IT ticket. A business continuity plan forces the organization to name a fallback for asset delivery \u2014 a CDN cache, a local mirror, a pre-exported package of critical assets \u2014 before an incident, instead of improvising while a product launch is stalled. ISO 22301 is the reference standard most enterprises use to structure and audit such plans.","example_rows":[{"field":"Trigger","values":"DAM vendor outage, ransomware incident, cloud region failure"},{"field":"Fallback","values":"CDN-cached renditions keep serving live pages; local export mirror covers critical brand assets"},{"field":"Recovery priority","values":"Live e-commerce and active-campaign imagery restored before archival assets"}],"mistake":"Plans get written once to satisfy an audit or enterprise procurement checklist and are never rehearsed, so when an incident hits, nobody actually knows the manual steps to swap a broken DAM link for the static fallback.","deep_link":""},"silo":[24],"class_list":["post-2576","glossary","type-glossary","status-publish","hentry","silo-glossary"],"_links":{"self":[{"href":"https:\/\/picajet.com\/articles\/wp-json\/wp\/v2\/glossary\/2576","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/picajet.com\/articles\/wp-json\/wp\/v2\/glossary"}],"about":[{"href":"https:\/\/picajet.com\/articles\/wp-json\/wp\/v2\/types\/glossary"}],"version-history":[{"count":3,"href":"https:\/\/picajet.com\/articles\/wp-json\/wp\/v2\/glossary\/2576\/revisions"}],"predecessor-version":[{"id":3544,"href":"https:\/\/picajet.com\/articles\/wp-json\/wp\/v2\/glossary\/2576\/revisions\/3544"}],"wp:attachment":[{"href":"https:\/\/picajet.com\/articles\/wp-json\/wp\/v2\/media?parent=2576"}],"wp:term":[{"taxonomy":"silo","embeddable":true,"href":"https:\/\/picajet.com\/articles\/wp-json\/wp\/v2\/silo?post=2576"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}